From: route@monster.com
Sent: Thursday, January 28, 2016 5:17 PM
To: hg@apeironinc.com
Subject: Please review this candidate for: OSP Engineer
This resume has been forwarded to
you at the request of Monster User xapeix03
|
|||||||
|
|||||||
|
|
|
||||||
|
||||||
|
Elliott Truss trusselliott@yahoo.com (661) 317-7633 Skills: ·
Fiber Optic
& Copper Splicing, Wireless, Tower Work, Cell Sites, DAS, Central Office
Installer/Level IV, GO95 & GO128 CAT 5&6,Underground Utility Locate,
ArcGIS, Auto Cad, Reading Prints, Fiber Optic Tester, Inspector, Field
Engineer, OSP Engineer, Locator, Construction, Internet Savvy, Proficient in
MS Word, Excel and Power Point, Dependable, Detail Oriented, Works well under
pressure Education ·
Certification
in Telecommunications/Fiber Optics & Copper Cable Splicing, 4.0., 1990 – 1992 ·
Certification
in Basic Electronics, EL Camino JC Terrence, Ca. 1984 – 1985 ·
High School
Diploma, Leroy Allen Locke HS, Los Angeles, CA, 1980 Work Experience: CHC Consulting –
Valley Central, CaliforniaMar 2015 to June 2015 Field Engineer ·
Inspect New
and Old JPA poles all aspects GO95, OCAL, Tags, Anchors, Distribution Arms.
Drops. Prescribe Make Ready recommendations from point A to C, from Ariel to
underground, manholes, vaults, pull box etc. ·
Stick
drawings, As-Built and findings of all work required for pole transfers of
Terminals, Strands, Cable (Electric, Telco, CATV, Fiber and Guys) Landscape,
Walls, Fence issues specific work required to remove pole and R/R (Remove and
Replace).Note pole out of lead recommend extension arm or distribution arm,
trenching or jack and bore and removal of old pole. Pinnacle/AT&T -
Palmdale, CAMar 2013 to Sep 2014 Field Inspector ·
California
Scenic Hwy Project, view all ACM, GO95 Aerial Construction Facilities, GO 128
Underground Construction Facilities, JPA, Cell Sites, Co Locations,
Terminals, Buildings, SDU, MDUs Poles using MIC, Aires, GIS, adding
layers and removal of facilities that did not exist or removed Field View,
Matrix, FMS, Snipping tool. ·
Document all
findings and exclusions etc Line Extensions, Cable Replacements,
Over-lashing, New Strands and Fiber Travel to Wire Centers throughout
Southern California to view paper maps or mylar for finding not digitized as
of yet. 4G/Nexius/Clearwire
- Kansas City, MOMar 2012 to Mar 2013 Technician/Inataller ·
Programmed,
Dragonwave, Red-Line, E-band and Motorola Microwave. ·
Configured
and, aligned Microwave Equipment, Horizon Duo and Compact IDU System. ·
Cross
referenced Link Configurations, Azimuth, TX power, Frequencies and, Polarity,
Loopback testing (JDSU) testing cat5e, coax (Fluke) Sonus - Lancaster,
CAJan 2011 to Mar 2011 Field Engineer ·
Site surveys
measurements and footage of further cabling, Took pictures of floor plans,
as-built , ·
Termination
and wreck outs, uploaded documents & findings via laptop to GALIATH - Los
Angeles, CAOct 2008 to Aug 2010 Supervisor/Installer ·
DAS,
Installation of transmitters and receivers, Alarms, Power, Network cabling
(Coax, Copper & Fiber) to NIU (Network Interface Unit) HUB to Cell Site,
Termination of cable Labeling and Power Up and Fire Stops. ·
Supervised
two crews of four AT&T/Mountain
Ltd - Alhambra, CAJuly 2007 to July 2008 Lead Field Engineer ·
U-Verse
project, pre-field jobs (as builds) stick drawings, observe cable count
before and after cuts, SFDs, MDUs, JPA, Building, Built terminals,
handholes, manholes, aireal, underground (GO95, GO128) SAI'S, VRADS
Surveyed cable legs from beginning to end ·
Worked with
computer to download all finding & pictures Completed worksheets
&drawings working closely with Plant Engineers AT&T – Sacramento,
CA
Dec 2006 to April 2007 Inspector ·
Inspection of
V-Rad construction, Cabinets, New and existing SAIs, halos, grounding,
concrete pours, anchoring, City Specs and OSHA FJS/Time Warner -
Palmdale, CAMay 2004 to Oct 2006 Inspector ·
Inspection of
buried plant construction and installation, MDUs, SFDs, Buildings
Inspection of 2" conduits, laterals, sweeps, shadings, drops underground
and aireil, grounding requirements, amps and dead ends Inspection of
pole transfers, concrete cuts and R/R G.O 95, as well as GO128 Read prints,
and changed as needed OSP/Q-West
Communications - Richardson, TXMay 2001 to Dec 2002 Inspector/Fiber
Optic Tester ·
Ran all tests
on fiber, Chromatic Dispersion, Power Meter, Log DB Loss
Hotcuts-testing fiber after spliced Sent traces to home office viva
laptop using Word & Excel ·
Checked
aireil fiber to insure specs for GO 95 were followed and tagged T.G.F.
Communications - Carson, CAJan 2000 to Mar 2001 Lead
Installer/Central Office ·
Familiarity
to cover MOP for job requirements Insured safe work procedures followed
per OSHA Start-ups, fiber splicing, structured cabling, Iron work,
Racks, troubleshot and repair Telpro Technologies
Inc - Burbank, CAFeb 1999 to Dec 2000 Office Central
Installer ·
Took
inventory of supplies Followed MOP ·
Installed RC
28, OC 48, Camtofs, DAX 4-5 DXS 3's and Power Cuts ·
Routing of
cable in the CO Used color code in installation of bays & wire wrapping,
as well as punch down, Iron Work Total Recall
Construction – Southern,
CA
Feb 1996 to Sept 2006 Owner/Contractor ·
General Contractor- Remodeled homes, kitchens, bathrooms,
add on, flooring, foundations, plumbing electric, re- piping, ran crew of six
men and sub-contractors hired for specific jobs, dealt with city inspectors,
ordering supplies, maintained paper work payroll etc. conducted all
safety inspections wrote out MOP (Method of Procedures) also SOWs (Scoop of
Work) |
|
|
|||||||||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||||||
|
|